2011 :: 2010 :: 2009 :: 2008 :: 2007 :: 2006
Jul :: Jun :: Feb :: Jan
 
26 juli, 2010

AB Lindec fick förtroendet och nöjet att leverera till det Estländska bolaget ”Merko Ehitus AS” (www.merko.ee) Lithurin I betonghärdning till ”Ämari Airbase” nära Tallin, Estland. Den totala ytan som behandlades var 33 000 m2.

10 juni, 2010

Cemen Tech introduced a new model - MCD8-100RM pumper which combines volumetric concrete mixer and concrete pump.

24 februari, 2010
Allen 436 Economy

Allen Economy Walk Behind series is introduced

27 januari, 2010

AB Lin-Pro and AB Lindec will for the fourth time exhibit at the worlds largest construction equipment exhibition. Bauma 2010 is set to meet new challenges of the market and we are there to join in!